Project inputs, not magic numbers

Prepare a solar-lighting brief that can be engineered.

A product label cannot describe your sky, geometry, night schedule or maintenance context. This worksheet helps capture the variables a supplier should ask about.

System map

Follow the energy from site to night.

Each decision affects the next: daylight collection, conversion, storage, control, optical delivery and maintenance.

1. Collect

Project location, seasonal sun, shade, panel orientation and available surface.

2. Store & control

Night schedule, control profile, critical periods and autonomy expectation.

3. Deliver light

Task, geometry, mounting, distribution, glare context and surrounding surfaces.

4. Maintain

Access, replaceable parts, cleaning, inspection and service responsibility.

Interactive worksheet

Build the first-message checklist.

Select the inputs you can provide now, copy the list, and attach drawings or photos separately.

Site and geometry
Operation and environment
Commercial and verification

Avoid false precision

Ask for the assumptions behind the answer.

  • Which exact model and variant?Keep the identity consistent across quote, sample, specification and documents.
  • Which site inputs were used?A design response should refer back to the location, geometry and operating profile.
  • What is verified on the sample?Agree the acceptance checks and evidence before scaled production.
  • What remains project-dependent?Record exclusions and open questions instead of filling them with assumptions.

A useful quote starts with context

Tell us where the light has to work.

Build your project enquiry